Erickson Associates, Inc. was selected to perform the mechanical subcontract work for Drug Discovery and Bioengineering Buildings at the Medical University of South Carolina. The 220,000sqft research facility project consisted of two simultaneously constructed lab facilities and expansion of the existing energy plant. Four new …
Erickson Associates, Inc. performed an upgrade to Chiller #3 in 2011 from the existing 600 tons to a new 1200 ton chiller completed a series of chiller upgrades that began with the original construction 1972 surgery addition central energy plant that included (3) 600 ton …
In 2016, Erickson Associates, Inc. participated in preconstruction design assistance and budgeting to result in the upgrade to energy plant while the hospital remained fully functioning and maintaining services from the energy plant. Elements of the project include – connecting a temporary chiller to the …
Erickson Associates, Inc. entered into a prime mechanical contract to replace and upgrade the HVAC system in a 50 year old, 110,000 sqft school and detached 13,000 sqft gym. The project was completed in 10 weeks. Equipment serviced and/or installed was as follows: -(32) water …
In October, 2015, Erickson Associates, Inc. completed the HVAC, Plumbing and Medical Gas work for the Landmark Hospital LTAC project in Savannah, Georgia. Landmark is a 45,000 sqft facility served by Central Station Split System AC Units with VAV Hot Water Reheat. The primary plumbing …
In 2013, Erickson Associates, Inc. Performed the plumbing and medical gas work for the 128,000 square foot 5-story facility. The work included renovating areas of the existing building at connections to the new Heart Center, connection of services to the existing energy plant primary equipment, …
Installed Mechanical and Plumbing in Lab Gas Systems for U.S. Customs Laboratory in Savannah, Georgia.