CEP Expansion II
Phoebe Putney Memorial Hospital
Albany, Georgia
Erickson Associates completed the HVAC, Plumbing, and Medical Gas work for the Central Energy Plant Expansion at PPMH. Prefabrication of major piping components in our fabrication shop proved to be key in the project’s success. Some of the project highlights include:
- (1) 1200 ton Centrifugal Chiller with Provision for a Future Chiller
- (1) 1200 ton, Two-cell Cooling Tower
- (1) Plate and Frame Chilled Water Economizer
- (1) 300 hp Secondary Chilled Water Pump
- Piping up to 24” within the Plant with Color-Coded PVC Insulation Jacketing
- 24” Pre-insulated Underground Chilled Water and Medical Gas Piping for the Future Medical Tower Project
Previous PPMH Projects:
- Eighth Floor Renovation – 2005
- Ninth Floor Renovations – 2003